INSTALLATION Establish the collection point and/or inspection point along the channel of the pipeline to be installed. considering that the collecting well is not self carrying, no less than 10-15cm of concrete is to be used around the collecting well. Lay a cement bed to prepare the base of the collecting well. Insert the dividers or a bell siphon and apply the grill or the lid. with the correct inclination and the fixed pipes place everything in the channel inserting the pipes in the rings and seal with silicon. Cut out corresponding to the diameter of the tube to be inserted. placing an object (preferably a piece of wood) on the opposite side in order to avoid accidental breakage or damage to the diaphragm. Fill the channel with cement made of fine sand so that all spaces are adequately filled in because the collecting well is not self carrying but becomes so with the adequate positioning of the cement. Finish the fittings keeping the paving some milimetres higher than the cover of the collecting well. in the case of an asphalted area, put some cold asphalt near the collecting well’s edge in order to prevent the boiling bitumen to alter the aesthetic quality of the product. cm. SI! NO! 1 2 3 4 5 6 SAVING AND LIGHTNESS 11
RkJQdWJsaXNoZXIy MTIzMjc4Nw==